Sometimes the market result would lead to more electricity flowing over a line or substation than it can safely carry. In that case, the grid operator intervenes by asking specific assets to change their planned output. Assets on one side of the constraint are asked to reduce output, while assets on the other side are asked to increase it. This process is called redispatch.
Assets that take part in redispatch are compensated for these adjustments, according to rules that differ by country. Large batteries and renewable parks are increasingly required or invited to provide this service, as they can adjust their output quickly and precisely. Redispatch is closely linked to related grid obligations such as scheduling and voltage control. Handling these instructions correctly avoids penalties and makes sure the asset is properly compensated.