Every connection to the electricity grid must be covered by a Balance Responsible Party. The BRP submits the expected injection and offtake of the assets in its portfolio to the transmission system operator (TSO). After each settlement period, typically a quarter hour, the TSO compares the plan with what actually happened. Every deviation is settled at the imbalance price, which can be very high or even negative depending on the state of the grid.
This makes the BRP role a financial responsibility that requires accurate forecasting and constant monitoring. For an asset owner, appointing a capable BRP is mandatory and has a direct impact on net revenue. A skilled BRP can even turn this obligation into a source of income, by steering flexible assets in a direction that helps the system and earns the imbalance price.